Oil and Stone Delays

Suite-Kote who provides the oil for the roadwork is very concerned over bad weather and possible eco problems with the oil if we get any heavy rain. In the best interests of all we are re-scheduling until Wed or Thursday of next week the 12 or 13 of July. This

ROCK SLIDE ON HONOCO RD

THERE HAS BEEN A SERIOUS SLIDE AT ABOUT 1309 HONOCO RD. THE SLIDE IS STILL IN PROGRESS AND MOVING SLOWLY, USE CAUTION THROUGH THIS AREA, GAS AND ELECTRIC CAME AND CUT A TREE DOWN WHICH HAD POTENTIAL TO TAKE DOWN THE ELECTRIC LINE. WE ARE MONITORING THIS.

Road Work-1133 Honoco,1129 Honoco

Road contouring work will be conducted at 1133 and 1129 Honoco Road (3.25mi south of entrance) on July 13th and 14th in order to improve surface drainage.  The road will remain open but heavy equipment will be operating so anticipate delays in navigating around this area.  Commercial trucks may wish

Archive Information Request

As was mentioned at the 2016 Annual Meeting, a review of our archival records indicates that some of our important Association documentation is missing from the archives.  We are hoping that some of the long-time Honoco residents can look through their records and provide docs that we can copy.  We

« Older Entries Recent Entries »